Aix Weather Widget (donate) icon

Aix Weather Widget (donate)

Version 0.1.9.18

Specifications

Technical details for Aix Weather Widget (donate)
Updated
CategoryApps › Weather
Version0.1.9.18
Mod InfoFull Paid
Requires AndroidVaries with device
Size600 KB

About this release

Aix Weather Widget (donate) 0.1.9.18 Apk Full Paid latest is a Weather Android app

Download last version Aix Weather Widget (donate) Apk Full Paid For Android with direct link

Aix Weather Widget (donate) is a Weather android app made by Per Magnus Veierland that you can install on your android devices an enjoy

Aix is a pure homescreen app widget that shows temperature, maximum/minimum precipitation and sun rise/set times graphically to give you a compact and accurate forecast.

Weather data is taken from Norwegian Meteorological Institute and NOAA National Weather Service. Data will be most accurate for Europe and the US.

Please check out the introduction by either opening the app from the market, or by using the menu key while on the Aix configuration screen. If you have any issues with the widget, please email me so I can help you.

This widget is designed to work in a portrait 4×1 format.

From MET data provider regarding recent change:

“The weather forecasts on Yr for large parts of northern Europe was until the 14th of December based on an old weather forecast model called Hirlam 8 km. This model is now discontinued. It has been replaced by the ECMWF model. Unfortunately this means that we can no longer provide short term forecasts with hourly resolution for the UK on Yr. The temporal resolution is now 3 hourly.

We are working on providing a global forecast with hourly resolution and hope we can roll out this update in the not too distant future.”

Aix Weather Widget (donate) Apk Full
What’s New:

-Updated app to support api.met.no Sunrise API version 2.0.
-Reduced sun rise/set transitions to 30 minutes.
-Redid drawing logic for day/night transitions.

Aix Weather Widget (donate) Apk Full

Aix Weather Widget (donate) Apk Full

Share

Comments

No comments yet. Be the first to share your thoughts.

Leave a Reply

Your email address will not be published. Required fields are marked *